Fill in the fields — the result appears as you type.
Wake time dominates at short cycles — every-second reporting on Wi-Fi needs mains, not batteries. Battery nodes typically report per minute or slower with deep sleep between.
Engineering aid only — verify results against the applicable code edition and the equipment datasheet before committing to a design.
Start a guided trial with no card required, model your site count in the live calculator — plans from ₹999/site/mo — or book a walkthrough with an engineer.